ePCT Access Handover Checklist Before China National Phase Entry
When a team changes PCT representatives before China entry, it needs working access to the international file and a separate, confirmed plan for the Chinese filing. ePCT access rights control what a WIPO account can do with an international application in the system. Use this worksheet to compare account permissions, tasks and records before work changes hands. For the China filing package itself, use the China national phase entry checklist.
Build one row for each account and filing task
| Item | Capture in the worksheet | Evidence of completion |
|---|---|---|
| Case identity | International application number, applicant and publication status | The authorized user opens the correct case |
| Account and role | Named user, WIPO connection, eOwner, eEditor or eViewer, reason and end date | The agreed permission is confirmed in the case |
| International representation | Current recorded representative and whether a Rule 92bis change is required | The relevant WIPO correspondence and recording status |
| China instructions | Responsible filing professional, next deadline and approved document package | Written acceptance, independent calendar check and submission confirmation |
Work through the handover before the filing window closes
1. Identify the exact application and the next decision
Start with the international application number, the name on the international record and your internal reference. Enter the publication status and any open requests or recent correspondence. If several applications belong to the same family, build a separate worksheet for each. Early in the handover, decide which work needs international file access, such as reviewing the search report, and which work belongs to the national phase team.
Set a date for the access check before the drafting or translation work begins. Identify a named person to chase missing records. If a filing deadline is close, keep the deadline work moving through your authorized representatives while they resolve the portal issue. The worksheet is a record of assignments and evidence, and the responsible filing professional should determine the actual deadline.
2. Match each account to what its user needs to do
WIPO uses three access levels: eOwner, eEditor and eViewer. An eOwner can manage access, so reserve that level for authorized people who are responsible for continuity. For someone preparing material or only reviewing it, ask which lower access level supports the task. WIPO recommends having two eOwners per application to help manage access. Choose two named, authorized people with clear handover responsibilities.
Use separate WIPO accounts with strong authentication. WIPO requires a connection before access can be shared. Have the receiving user confirm the correct case and role through their own account. Never share credentials or paste confidential case details into public forms. Portal permissions and legal authority to sign, instruct or represent the applicant must be checked separately.
3. Plan the international representative change if required
If the recorded international agent needs to change, have the authorized representative check the Rule 92bis process and the request documents. WIPO recommends arranging access with an existing eOwner before submitting the change request where possible. If the outgoing team cannot share access, check WIPO’s procedure for the publication status and the type of request. For an unpublished application, the IB/301 code may be needed in the later access request. Keep it within the authorized team.
A change-of-agent request to the International Bureau can suspend online access until the confirmation process is completed. Assign someone to monitor the WIPO message, review which users are listed and follow the instructions for retaining or removing access. WIPO describes a seven-day lifetime for the confirmation link and a way to request a new one. The seven days concern the link. Track any legal time limit separately.
4. Agree on what the China team needs to receive
Export or transfer the agreed documents through an authorized secure channel. Check the original application as filed, WIPO correspondence, the international search report and written opinion, and any amendments or later procedural papers relevant to the China filing. Attach a short version list. Give each file a description, document date and purpose so that the translation team can tell original text from later versions. Use the PCT international search and written opinion checklist to organize the search materials.
Any change of representative recorded by the International Bureau concerns the international record. Confirm the China representative, filing authority, translation instructions and national filing steps separately. Assign a person to obtain the actual CNIPA filing evidence when the national phase work is done.
5. Verify the end state with the people doing the work
Ask the receiving team to verify the correct international case and access level in its account. Review whether outgoing users still have a reason to remain on the case and have the authorized owner make any needed access changes. Record who checked the settings and when. Store a sanitized log for internal use and keep private WIPO notices and identifiers in the approved case file.
For a team with multiple cases, record which users were approved for each individual application. A person who needs to review the search opinion for one case may have no assignment on the next. Keep the reason for access and the person who approved it together. During the final review, compare that list with the settings in each case and ask the recipient to verify access rather than relying on the sender’s recollection.
Hold a brief handover review with the deadline owner, the recipient and the document owner. Check that the China team has accepted the work and that someone will confirm which versions and steps were actually filed. If one of these items is open, keep it visible in the docket until evidence arrives. A colleague being able to see the application is one check in a longer handover.
Example: a new agent receives an unpublished case
Suppose a company plans to change its international agent while preparing a China entry. The outgoing eOwner connects with the approved new account and checks whether access can be arranged before the change request. The team assigns someone to watch WIPO’s email and verify the confirmed roles after any suspension. In parallel, a separate China filing lead confirms the filing date calculation, the documents to translate and the local instructions. The team keeps both tasks open until it has evidence for each. This example is hypothetical.
Questions during handover
Does eOwner access authorize a signature?
An eOwner can control system access. Verify signature and representation authority separately under the applicable rules and appointment documents.
Why has a formerly visible application disappeared?
Confirm the correct account and application and ask whether a change request has triggered the WIPO confirmation process. Check the notice with the authorized representative.
Does a Rule 92bis change appoint my national phase agent?
The process updates the applicable international record. Confirm the national phase engagement and any required filing authority with the China team.
Can we wait for access to return before dealing with the deadline?
Keep work on the confirmed official timeline and coordinate lawful contingency steps with the authorized representative. Assign a separate owner for the portal problem.
For an initial China filing enquiry, bring the international application number, publication status and a summary of the open questions. Arrange a secure route for nonpublic documents and access information. Explore China PCT support or contact us.
Official sources
WIPO ePCT access tutorials · WIPO guidance on agent changes and access · WIPO PCT Rule 92bis · ePCT for applicants
Sources checked on 16 November 2026. This worksheet helps organize a handover. It cannot replace case-specific legal advice or an independent deadline check.